Skip to main content

Solar Panel Removal in Ellis County — Certified R&R for Every Roof, Every Storm

Solar panel removal in Ellis County requires a licensed electrician who understands the county’s specific weather patterns, utility interconnection procedures, and permit jurisdictions. Remove Solar Reset provides certified removal and reinstallation across all of Ellis County’s 2 served cities, backed by a 10-year workmanship warranty and Tesla, Enphase, and SolarEdge certifications. Call (469) 283-1089 for a written quote.

Ellis County sits on the southern edge of the Dallas-Fort Worth Metroplex where suburban growth has accelerated dramatically since 2018. Midlothian’s master-planned communities — Hawkwood, Crystal Lagoons, and the Plainview developments — were built with solar pre-wiring standard, and many of those systems are now approaching their first re-roofing cycle. Waxahachie’s historic downtown district adds a layer of permitting complexity not found in the newer suburbs to the north.

Ellis County — Quick Facts for Solar Homeowners

Population192,455
County SeatWaxahachie
Cities Served2 cities
Hail Frequency3–5 events/year (southern Tornado Alley)
Drive from Dallas~40 min south of Dallas
Primary UtilityOncor Electric Delivery

Why Ellis County Homeowners Need Professional Solar Panel Removal

Ellis County sits at the southern boundary of Tornado Alley, and supercell thunderstorms that track northeast from San Antonio and Austin pass directly over Waxahachie before hitting Dallas. The county averages three to five significant hail events per year, with the Midlothian corridor recording larger hail stones than most northern DFW counties due to the flat terrain and longer storm tracks. Systems installed during Midlothian’s construction boom between 2020 and 2024 were often done under builder contracts with national installers who are now difficult to reach for warranty service.

Waxahachie’s historic district requires review by the Historic Preservation Officer before exterior work that alters the appearance of contributing structures. Solar removal that returns a roof to its pre-solar appearance typically passes without full review, but reinstallation of an array with different panel dimensions or mounting hardware may require a certificate of appropriateness. Midlothian’s rapid growth means the permit desk is one of the busiest in North Texas — we file permits immediately on authorization to get ahead of the queue.

Our Solar Panel Removal Process in Ellis County

Every project in Ellis County follows the same certified seven-step process regardless of system brand or roof type. Nothing is skipped to save time.

1

Site Assessment & Permit Filing

A licensed electrician performs our 42-point inspection of your Ellis County property, documents system configuration, roof condition, and mounting hardware integrity. Permits are filed the same day you sign the work authorization.

2

Utility Disconnection Coordination

We file the grid-disconnection request with the appropriate utility serving your Ellis County address. No live wiring is disturbed until written utility clearance is received. This step protects your inverter warranty and satisfies local code requirements.

3

Panel Removal — Certified Procedure

Panels are disconnected at the module level (microinverter) or inverter level (string system), unracked in sequence, and transported to padded storage racks. Every bracket torque setting is recorded before removal. Nothing is forced or rushed.

4

Roof Preparation & Damage Documentation

With panels cleared, the roof surface is fully accessible for your roofing contractor. We provide a written condition report of the roof area exposed during removal. If hail or wind damage is documented, this report satisfies your insurer’s licensed-electrician requirement.

5

Coordination with Roofing Contractor

We communicate directly with your roofer on scheduling so reinstallation is booked before the roofing crew finishes. The goal is zero days of unnecessary solar downtime between roof completion and panel reinstallation.

6

Panel Reinstallation — Manufacturer Specifications

Panels are reinstalled to Tesla, Enphase, or SolarEdge specifications as applicable. Every fastener is torqued to spec, ground continuity is tested, and the system is brought online under licensed electrician supervision.

7

Final Inspection & Documentation Package

We perform a post-reinstallation production test, confirm monitoring connectivity, and deliver the project documentation package including photos, torque records, permit close-out, and the {WARRANTY} certificate.

DIY vs. Professional Solar Panel Removal in Ellis County

The cost of DIY removal in Ellis County is not measured in money — it is measured in voided warranties, failed permit inspections, and uncorrected damage that compounds through multiple storm seasons. Here is the comparison homeowners across Waxahachie and the surrounding cities consistently ask us to explain.

FactorDIY / Unlicensed ContractorRemove Solar Reset (Licensed)
Manufacturer warranty preservedNo — voided immediatelyYes — required for warranty validity
Utility disconnection filedTypically skippedFiled before every project
Roof decking assessmentNot performedIncluded in 42-point inspection
Hardware torque documentationNoneRecorded per mounting point
Insurance damage reportNot accepted by insurersSigned by licensed electrician
Permit pulledRarelyEvery project, every jurisdiction
Fall protection equipmentConsumer ladder onlyOSHA-rated harness system
Workmanship warrantyNone10-year workmanship warranty

Solar Panel Services in Ellis County

Solar Panel Removal

Certified removal for roof replacement, storm damage repair, and system relocation. Oncor or cooperative utility coordination included. All permits filed.

Solar Panel Maintenance

Annual and post-storm maintenance service including 42-point inspection, cleaning, torque verification, and production testing. Documentation included.

Solar Panel Repair

Panel replacement, inverter service, mounting hardware repair, and roof flashing correction. Tesla, Enphase, and SolarEdge certified for warranty-valid repair.

Cost and Insurance for Solar Panel Removal in Ellis County

Ellis County removal runs $200–$300 per panel. The mix of new master-plan construction in Midlothian and older historic housing in Waxahachie creates two distinct pricing tiers. New Midlothian systems on standard-pitch shingle roofs are typically at the lower end of the rate range. Waxahachie projects involving steep rooflines or historic district coordination carry additional planning time that is quoted as a separate line item. Ellis County’s southern Tornado Alley position means insurance claims are common — we prepare full licensed-electrician damage documentation for all major Texas homeowner insurers operating in the county.

Frequently Asked Questions — Ellis County

My Midlothian home is in the Crystal Lagoons development. Does the master HOA need to approve removal?

Crystal Lagoons and Hawkwood community HOAs in Midlothian require advance written notification for any exterior work that visibly alters the roofline during the project period. Full removal and reinstallation projects typically receive standard maintenance approval within 5–7 days when submitted with our insurance and license documentation. We handle HOA submission as part of every Ellis County project scope.

Is my Waxahachie historic home subject to preservation review for solar removal?

Waxahachie properties within the historic district overlay require review only when exterior modifications are visible from a public right-of-way and alter the contributing character of the structure. Solar panel removal that restores the original roof appearance typically qualifies as maintenance rather than alteration. We identify the applicable review category during the site visit and coordinate with the Historic Preservation Officer before starting work.

What storm systems typically produce the hail events in Ellis County?

Ellis County’s hail events are predominantly produced by supercell thunderstorms that develop over the Edwards Plateau and track northeast, intensifying as they cross the flat terrain south of Dallas. These systems differ from the fast-moving squall lines that hit northern DFW — they tend to produce larger hail stones that cause proportionally greater panel damage. Ellis County homeowners should inspect panels after every storm event, not just the ones that make the news.

My installer from the Midlothian construction boom is unreachable. Can you service the system?

Builder-era systems installed 2020–2024 in Midlothian are frequently tied to national installers who have since restructured, merged, or exited Texas. We reconstruct system documentation from panel serial numbers and inverter logs, contact the original equipment manufacturers directly to confirm warranty status, and provide a complete service record for your property going forward. Tesla, Enphase, and SolarEdge all have certified-contractor transfer processes that we have completed for Ellis County homeowners.

How long does Midlothian permit issuance take for solar removal?

Midlothian’s permit desk has experienced high volume since 2022 due to the construction boom. Standard electrical permits for solar removal are currently running 5–8 business days. We file on the day we receive your signed work authorization, so permit issuance runs concurrently with your roofing contractor’s lead time rather than being a sequential delay. Same-day filing is our standard process across all Ellis County projects.

What does a 22-panel removal cost in Waxahachie?

A 22-panel system in Waxahachie runs $4,400–$6,600 at our standard $200–$300 per-panel rate. Waxahachie’s housing stock is mixed — newer historic-district homes on lower-pitch roofs are at the lower end of the range, while two-story newer construction in the growth areas can push higher due to additional fall-protection requirements. We provide a written itemized quote after the site assessment.

Can you perform the removal and reinstallation in the same week in Ellis County?

For a standard one-day removal and one-day reinstallation project in Midlothian or Waxahachie, we can typically schedule both days within the same week when roofing work is pre-scheduled. We coordinate directly with your roofing contractor to align timing. Permit lead time is the primary scheduling variable — which is why we file permits the same day you sign the authorization.

Do you cover rural properties in Ellis County outside Waxahachie and Midlothian?

Yes. We serve all of Ellis County including properties on county roads and rural routes. Rural projects require additional logistics staging — there is no materials supply point between our Dallas staging area and a rural Ellis County address — but all of that planning happens before crew deployment. Rural project quotes include drive time and staging costs as a transparent line item rather than a surprise fuel surcharge.

Ready to Schedule Solar Panel Removal in Ellis County?

Fernando Alegre and the Remove Solar Reset crew serve all of Ellis County’s 2 cities with the same master-electrician credentials, manufacturer certifications, and 10-year workmanship warranty on every project. Written quotes, no pressure, no hidden fees.

Get Your Free Written Quote(469) 283-1089

Content prepared under the direction of Fernando Alegre, Master Electrician, 9+ years solar experience, Tesla, Enphase, and SolarEdge certified. Remove Solar Reset LLC — 11005 Indian Trail Suite 111, Dallas, TX 75229.